# Waugh Thistleton Architects

London architects of engineered timber housing and offices, including Murray Grove and the mixed-use Dalston Works.

- **Operating status:** Active. Its site, based in London, posts news through November 2026, including a 2026 CESUGA Innovation Award for its Travelling Pavilion shown in Madrid. [1]
- **Momentum:** Unknown
- **Ownership:** Unknown
- **Headquarters:** London, England, United Kingdom
- **Founded:** 1997
- **Role:** Architect
- **Practice:** Mass timber design, Mixed-use, Infill, Affordable housing
- **Field Guides:** Regenerative Placemaking
- **Website:** https://waughthistleton.com/ (loaded when checked)

Checked 2026-11-23. Page: https://nowcitylabs.com/fieldguide/placemaking/p/waugh-thistleton/

## Summary by the Lead Analyst

Waugh Thistleton is a London practice founded in 1997 by Andrew Waugh and Anthony Thistleton that designs in engineered timber. Named press documents Murray Grove (2009), with private and affordable homes, and Dalston Works (2017), a 121-home mixed-use building on a brownfield site. RIBA gave its timber office for The Office Group a 2024 National Award. Carbon figures are engineer or firm estimates; headcount, ownership and certifications are not sourced.

Verify first: Carbon storage figures are design-stage estimates; ask for any verified whole-life carbon assessment.

## What it is

Waugh Thistleton Architects was founded in 1997 by Andrew Waugh and Anthony Thistleton. It is a London design, consultancy and research practice working mainly in engineered timber. [1][2]
It designed Murray Grove in Hackney, completed in 2009, a nine-story housing building with a cross-laminated timber superstructure for Telford Homes, and Dalston Works, completed in 2017, a ten-story building with 121 apartments, shops, restaurants and workspace. [2][3][4]
Its Black & White Building, an office in LVL and cross-laminated timber for The Office Group, won a RIBA National Award in 2024. [6]

## Key facts

- Founded: 1997 [2]
- Headquarters: London [1]
- Signature project: Dalston Works, London, 2017 [2]
- Serves: United Kingdom [2][6]

## Card fields

The same 8 fields every Regenerative Placemaking card, table row and comparison shows. A missing value says why: No data or Not published.

- Role: Architect
- Practice: Mass timber design, Mixed-use, Infill, Affordable housing
- Signature project: Murray Grove (Stadthaus), London, United Kingdom, 2009 (Architect); Dalston Works, London, United Kingdom, 2017 (Architect); The Black & White Building, London, United Kingdom (Architect)
- Places active: United Kingdom
- Scale: Not published
- Certifications: No data
- Evidence: Strong
- Checked: Nov 2026

## Practice

- Mass timber design, Cross-laminated timber superstructures at Murray Grove and Dalston Works [2][4]
- Mixed-use, Dalston Works: 121 homes, shops, restaurants and a workspace hub [3]
- Infill, Dalston Works built on a formerly neglected brownfield site [3]
- Affordable housing, Murray Grove mixes private and affordable homes [4]

## Signature projects

- Murray Grove (Stadthaus), London, United Kingdom, 2009 (Architect): Nine-story housing in Hackney for Telford Homes with a cross-laminated timber superstructure, the tallest timber residential building in the world at completion. Mixes private and affordable homes. [4][5]
- Dalston Works, London, United Kingdom, 2017 (Architect): Ten-story, 121-apartment building for Regal London with retail, restaurants and workspace. The largest cross-laminated timber building in the world at completion, with 3,852 cubic meters of CLT. [2][3]
- The Black & White Building, London, United Kingdom (Architect): Office building of 4,480 square meters in LVL and cross-laminated timber for The Office Group. RIBA London Award and RIBA National Award 2024. [6]

## Serves

- United Kingdom (GB) [2][6]

## Timeline

- 1997 (founded): Founded by Andrew Waugh and Anthony Thistleton. [2]
- 2009 (milestone): Murray Grove was completed in Hackney, the tallest timber residential building in the world at the time. [4]
- 2017 (milestone): Dalston Works was completed, the largest cross-laminated timber building in the world at completion. [2][3]
- 2024 (milestone): The Black & White Building won a RIBA National Award. [6]

## Findings by five AI specialists

A level is the strength of the public evidence for one specialist, on a scale of 0 to 4. It is not a grade of the company, and there is no total.

### Materials and Circularity: Third-party evidence (level 3)

Named press reports cross-laminated timber superstructures at Murray Grove (2009) and Dalston Works (2017), and facade panels at Murray Grove that are 70 percent wood pulp. RIBA lists LVL and CLT at the Black & White Building. No waste or disassembly figures are published.

- Evidence: Dezeen reported 3,852 cubic meters of CLT at Dalston Works. [2]
- Evidence: Dezeen reported Murray Grove cladding panels made of 70 percent wood pulp mixed with fiber cement. [4]
- Evidence: RIBA lists LVL and CLT as the structure of the Black & White Building. [6]
- Gap: Construction waste, reused material and design for disassembly figures.

### Energy and Carbon: Specifics published (level 2)

Carbon figures are estimates: Ramboll, the project engineer, estimated Dalston Works stores more than 2,600 metric tons of CO2, and the firm states Murray Grove stores over 181 metric tons of carbon. No independent verification or measured energy use is published.

- Evidence: Dezeen reported Ramboll's estimate that Dalston Works stores more than 2,600 metric tons of CO2. [2]
- Evidence: Dezeen reported the firm's figure of over 181 metric tons of carbon stored in Murray Grove. [4]
- Gap: Verified whole-life carbon assessments and measured operational energy.

### Cost and Access: Third-party evidence (level 3)

Dezeen reported Dalston Works rents of about 2,190 pounds a month for a two-bedroom unit, with 102 of 121 units let through an aparthotel brand, and that Murray Grove mixes private and affordable homes. The number of affordable homes is not stated.

- Evidence: Dezeen reported a two-bedroom rent of about 2,190 pounds a month at Dalston Works. [3]
- Evidence: Dezeen reported Murray Grove has private and affordable housing with separate entrances. [4]
- Gap: Counts of affordable homes and their rents across projects.

### Workforce: No public evidence (level 0)

No headcount, ownership, training or employment data for the practice were found in the sources opened.

- Gap: Staff numbers and any workforce disclosures.

### Delivery Record: Third-party evidence (level 3)

Founded in 1997. Named press and RIBA document completed buildings in 2009 and 2017 and a 2024 RIBA National Award. No total count of completed projects is published in the sources opened.

- Evidence: Dezeen reported Murray Grove completed in 2009. [4]
- Evidence: Dezeen reported Dalston Works completed in 2017. [2]
- Evidence: RIBA lists the Black & White Building as a 2024 National Award winner. [6]
- Gap: Total completed projects, headcount and revenue.

## Sources

1. [Waugh Thistleton Architects home page](https://waughthistleton.com/) (Waugh Thistleton Architects)
2. [Dalston Works demonstrated that timber is a viable alternative to concrete and steel at scale](https://www.dezeen.com/2023/03/23/dalston-works-waugh-thistleton-architects-timber-revolution/) (Dezeen)
3. [Dalston Works by Waugh Thistleton Architects (2017 report)](https://www.dezeen.com/2017/11/01/worlds-largest-cross-laminated-timber-tower-dalston-works-waugh-thistleton-regal-developments-sustainable-london/) (Dezeen)
4. [Murray Grove housing by Waugh Thistleton kickstarted tall-timber movement](https://www.dezeen.com/2023/03/10/murray-grove-stadthaus-waugh-thistleton-timber-revolution/) (Dezeen)
5. [Murray Grove Wood-Framed High-Rise](https://www.architectmagazine.com/technology/architectural-detail/murray-grove-wood-framed-high-rise_o) (Architect)
6. [The Black and White Building](https://www.riba.org/awards-and-competitions-landing-page/awards/riba-regional-awards/riba-london-award-winners/2024/the-black-and-white-building) (Royal Institute of British Architects)
