Patented system that prefabricates concrete floors, columns, wet areas and facade into modules for high-rise towers.
What it is
Hickory says its patented building technology joins the core, shear walls, bathrooms and facade of a building into one structure made off site, with an engineered concrete floor, load bearing columns, fitted wet areas and facade, and says it cuts construction time by up to 50 percent against traditional concrete methods.[1] Company claim
create digital reported in 2019 that Atira Student Living on La Trobe Street, Melbourne, a 43-story, 150 m tower, used 285 HBS modules and 629 Sync bathroom pods, with modules up to 17 m long and 26 t placed in under five minutes each, and was finished in 24 months.[2]
Business View Oceania reported in 2021 that HBS was in its eighth release, that Hickory used it on Collins House, a 60-level, 184 m Melbourne tower, and that components are made in a factory of over six hectares in Laverton North.[3]
At a glance
- Kind
- Building system
- Readiness
- Commercial[2]
- Licensing
- Licensing not published
- Materials
- Concrete
Who works with it and where
Places
- Plant
- Hickory factory, Laverton North, Australia[3]
Sources
3 sources, checked November 27, 2026.
- Hickory. Hickory Building Systems. Accessed November 27, 2026.
- create digital (Engineers Australia). Award-winning Melbourne high-rise came together piece by piece. Accessed November 27, 2026.
- Business View Oceania. Hickory: building innovation. Accessed November 27, 2026.
Work with us.
Commission deeper research and reporting. Or get help building your industrialized construction value chain: partnerships, cost estimates and deal structures.
Now City Development ServicesApply the research in NowCity.ai