Kit-of-parts mass timber system for multifamily apartments, about 30 components configured into many unit types.
What it is
Juno says its original building system uses 33 components that configure into more than 25 unit types, fabricated by local suppliers and delivered to site for assembly.[1] Company claim
Architectural Record reported in May 2024 that Juno East Austin, designed by Ennead with Juno, uses a kit of about 30 custom-fabricated components including mass plywood floor slabs and columns, LVL beams, bathroom pods and a unitized facade.[2]
The same report said the Austin building has 24 apartments in four levels of mass timber over a steel podium, opened in February 2024 after transformer delays, and that its timber superstructure went up in 28 days, about 60 percent faster than a comparable stick-built building.[2]
Juno says the Austin project was permitted in one meeting, compared with 3 to 4 meetings typically.[1] Company claim
At a glance
- Kind
- Building system
- Readiness
- Demonstration[2]
- Licensing
- Licensing not published
- Materials
- Mass timber
Who works with it and where
Places
- Demonstration
- Juno East Austin, Austin, TX[2]
Sources
2 sources, checked November 27, 2026.
- Juno. Juno Mass Timber System. Accessed November 27, 2026.
- Architectural Record. Ennead's mass timber apartment building in Austin pioneers productized housing. Accessed November 27, 2026.