Robot cells with up to five robots that frame, sheathe and insulate timber or light steel wall, floor and roof elements.

What it is
Randek says ZeroLabor robot cells do sheathing, insulation and sub-assembly, can be retrofitted onto running lines or run on their own, and that more than 50 ZeroLabor robotic systems are installed.[1] Company claim
LIGNA, the Hanover trade fair, reported ahead of LIGNA 2023 that the current ZeroLabor 3.0 can take up to five robots and builds wood or light steel wall frames, and that a ZeroLabor upgrade would automate insulation of wall and roof elements.[2]
KUKA published a 2023 case study of a ZeroLabor system planned with KUKA that produces wall panels for the Estonian modular builder Kodumaja, including walls with four layers of sheets on one side.[3]
At a glance
- Kind
- Equipment
- Readiness
- Commercial[3]
- Licensing
- Licensing not published
- Materials
- Light wood frame, Light-gauge steel
Who works with it and where
Sources
3 sources, checked November 27, 2026.
- Randek AB. Randek. Accessed November 27, 2026.
- LIGNA, Deutsche Messe. Robots ensure a warm home. Accessed November 27, 2026.
- KUKA. KUKA Nordic, SP Randek and Kodumaja. Accessed November 27, 2026.
Work with us.
Commission deeper research and reporting. Or get help building your industrialized construction value chain: partnerships, cost estimates and deal structures.
Now City Development ServicesApply the research in NowCity.ai