Networked robot cells that frame and sheathe timber wall elements automatically in prefab house factories.
What it is
HOMAG says WEINMANN presented smartPrefab at LIGNA in 2019 as a timber frame production system of autonomous robot cells linked in a network, controlled by an MES from its partner Granit.[1] Company claim
HOMAG says in the first station a robot takes studs and plates from two supply stations and places them in the frame, handling parts up to 75 kg and plates from 700 to 3,500 mm, and that in the next section, planned for mid-2021, one robot lays sheathing panels on the frame and a second fixes and processes them.[1] Company claim
HOMAG reported in March 2021 that the first section of the first smartPrefab was complete at the German prefab house maker WeberHaus, which extended its hall by 2,000 square meters for it.[1] Company claim
A Porsche Consulting article from April 2025 describes the framing station at WeberHaus in Rheinau-Linx as a WEINMANN smartPrefab system with a robot at its core, monitored by two employees.[3]
HOMAG says the builder B&O Bau uses smartPrefab solutions to produce timber housing.[2] Company claim
At a glance
- Kind
- Equipment
- Readiness
- Commercial[3]
- Licensing
- Licensing not published
- Materials
- Light wood frame
Who works with it and where
Sources
3 sources, checked November 27, 2026.
- HOMAG Group. The first WEINMANN smartPrefab at WeberHaus. Accessed November 27, 2026.
- HOMAG Group. WEINMANN Timber Construction Machinery. Accessed November 27, 2026.
- Porsche Newsroom (Porsche Consulting). Building should be fun. Accessed November 27, 2026.
Work with us.
Commission deeper research and reporting. Or get help building your industrialized construction value chain: partnerships, cost estimates and deal structures.
Now City Development ServicesApply the research in NowCity.ai