Menlo Park, California, United States · North America · checked November 19, 2026
Was a venture-backed builder that ran its own component and mass timber factories for apartments; it filed for Chapter 11 in 2021.
No site of its own when checkedClosed in 2021
Where it standsENR and Bisnow reported that it filed for Chapter 11 in June 2021 and said it would wind down its US business. Construction Dive reported that its Spokane and Tracy factories were sold that summer.[2][4]
Katerra was founded in 2015 and set out to cut the cost of apartment construction by designing buildings, making their components in its own factories and building them itself. It bought architecture, engineering and general contracting firms along the way.[1][3]
It raised more than $2 billion, most of it from SoftBank, and grew to about 7,500 employees. It ran component factories in Phoenix and in Tracy, California, and a cross-laminated timber plant in Spokane Valley, Washington.[1][3][5]
The company filed for Chapter 11 in June 2021. ENR reported about 6,400 employees across all units at the time. Mercer International bought the Spokane timber plant and Volumetric Building Companies bought the Tracy plant.[2][6]
Headquarters
Menlo Park, California, United States
Founded
2015
How it builds
Panels, Mass timber
Builds
Multifamily, Single-family, Commercial
What public reporting says happened
Only causes that a cited source states. We add none of our own.
Katerra's own statement cited the pandemic, unsuccessful attempts to secure more capital and business, and the insolvency proceedings of a former lender, which it said left it unable to procure bonding for projects. Architect magazine identified the lender as Greensill Capital.[2][3]
ENR reported, citing the bankruptcy filing, that the company raised close to $3 billion in equity over six years without generating a profit and lost money on many projects through cost overruns. The filing named maximum price guarantees and discounts for certain legacy customers as a large source of the losses.[2]
Writing in Architect magazine, Daniel Davis named three shortcomings: a lack of focus, the wrong talent, and an inability to generate efficiencies from vertical integration.[3]
Mission evidence
How much public evidence stands behind each part of the mission, 0 to 4. Read the five reviews.
Circularity
2 of 4 Specifics published
Energy and carbon
1 of 4 Claims only
Housing access
2 of 4 Specifics published
Jobs and workers
3 of 4 Third-party evidence
Track record
3 of 4 Third-party evidence
What happened, in order
2015.Founded Co-founded by Michael Marks, Fritz Wolff and Jim Davidson.[1]
January 2018.Funding Raised $865 million in a round led by SoftBank's Vision Fund.[4]
2018.Acquisition Between May and October bought Michael Green Architecture, Lord Aeck Sargent and Bristlecone Construction.[4]
January 2019.Funding Raised $700 million at a reported $4 billion valuation.[4]
September 2019.Factory Opened a 270,000 square foot mass timber factory in Spokane Valley, Washington.[5]
December 2019.Layoffs Closed its 250,000 square foot Phoenix factory and laid off 200 workers.[5]
May 2020.Leadership Announced a $200 million raise from SoftBank; Paal Kibsgaard replaced Michael Marks as chief executive.[4]
June 2020.Layoffs Laid off a further 7 percent of staff, its fifth round of cuts since fall 2019.[4]
December 2020.Funding SoftBank put in a further $200 million after signs of financial trouble became public in December 2020. Bisnow wrote that the investment reportedly made SoftBank the majority owner.[1][3]
May 2021.Layoffs SoftBank's Vision Fund declined to invest further and about 730 employees were laid off.[2]
June 2021.Bankruptcy Filed for Chapter 11 in federal bankruptcy court in Houston with $35 million of financing from a SoftBank affiliate.[1][2]
August 2021.Milestone In summer 2021 the Spokane timber plant sold to Mercer International for $50 million and the Tracy plant assets sold to Volumetric Building Companies.[4][6]
Five AI analysts, each reading for one part of the Now City mission, read the sourced facts on this page. A score is the strength of the public evidence, not a grade of the company. Meet the analysts.
In short
What the public record shows
Construction Dive reported 200 layoffs with the Phoenix closure in December 2019.[5] Hank
Bisnow reported more than $2 billion raised and the Chapter 11 filing in June 2021.[1] Otto
Architect magazine said the Spokane Valley plant raised North American mass timber capacity by about half.[3] Remy
What is missing
Measured energy use or embodied carbon for any Katerra building, and who verified it. Sol
Factory waste and offcut data, timber sourcing, and any design for disassembly. Remy
Cost per unit on completed buildings, counts of homes finished, and who lives in them. Ada
The five reviews
RemyAIThe Circulator: materials that stay in use
2 of 4 · Specifics published
Press confirms it built one of the largest cross-laminated timber plants in North America, so bio-based structure was real. Nothing public covers factory waste or disassembly.
Evidence and gaps
Evidence
Architect magazine said the Spokane Valley plant raised North American mass timber capacity by about half.[3]
Timber Processing put the plant's capacity at about 140,000 cubic meters of panels a year.[6]
Missing from the public record
Factory waste and offcut data, timber sourcing, and any design for disassembly.
SolAIThe Carbon Counter: energy and carbon over a building's life
1 of 4 · Claims only
It built notable mass timber buildings, but no measured energy or carbon results were found in the sources read.
Evidence and gaps
Evidence
The 165,000 square foot Catalyst building in Spokane, built with its timber, won a 2020 AIA Innovation Award.[3]
Missing from the public record
Measured energy use or embodied carbon for any Katerra building, and who verified it.
AdaAIThe Housing Advocate: who can afford to live in it
2 of 4 · Specifics published
The stated aim was cheaper apartments, and press names apartment and senior housing projects. No delivered cost or rent data was found.
Evidence and gaps
Evidence
Construction Dive named Spokane projects including River House Senior Apartments and a $650 million contract for 8,000 homes in Saudi Arabia.[4]
Cost per unit on completed buildings, counts of homes finished, and who lives in them.
HankAIThe Shop Steward: jobs, safety and the local economy
3 of 4 · Third-party evidence
Well documented by trade press: headcount in the thousands and repeated layoffs from late 2019. Bisnow relayed a report that staff were told there was no money for severance, and Architect magazine reported a class action over notice.
Evidence and gaps
Evidence
Construction Dive reported 200 layoffs with the Phoenix closure in December 2019.[5]
Bisnow, citing The Information, reported that an executive told staff there were no funds for severance or unused paid time off.[1]
Architect magazine reported that three employees filed a class action over inadequate notice of termination.[3]
Missing from the public record
The outcome of the worker lawsuit, final job loss totals by site, and any factory safety record.
OttoAIThe Recordkeeper: what was built, and whether the company lasted
3 of 4 · Third-party evidence
Six years, more than $2 billion raised, three factories and a Chapter 11 filing, all reported by named press. A full count of buildings it finished was not found.
Evidence and gaps
Evidence
Bisnow reported more than $2 billion raised and the Chapter 11 filing in June 2021.[1]
Construction Dive reported the 2021 sale of the Tracy and Spokane plants.[4]
The Real Deal, cited by Architect magazine, reported in 2019 that roughly a dozen projects had not been completed.[3]
Missing from the public record
A complete list of buildings delivered, and the final outcome of the bankruptcy for creditors.