Materials and Circularity
Where do the offcuts go, and can this building be taken apart and used again?No figure on print waste, material sourcing or reuse was found in the sources read.
Gap
- Material use and waste per printed home.
3D printing builder and supplier · Melbourne, Florida, United States · checked November 20, 2026
Prints concrete walls of homes on site with its own robots and sells the systems to builders, from Melbourne, Florida.
Compiled from the five specialist findings. Read the findings.
Apis Cor builds and sells robots that print the concrete walls of a house on site and builds homes with them in Brevard County, Florida. Public radio reported in December 2024 a four-bedroom model home listed for sale and Habitat for Humanity homes under way for households at 30 to 50 percent of area median income; one was dedicated in June 2026. Its site cites a printed building in Dubai. No count of homes delivered, funding amount or headcount was found.
Verify first. Only a handful of Florida homes are documented; ask how many homes and robots are in service.
Apis Cor was founded in 2016 by Nick and Anna Cheniuntai and is based in Melbourne, Florida. It develops construction printing robots and materials; its two robots, Frank and Gary, print concrete walls on the building site. The company site offers the robots to builders, homes and accessory units, short-term stays in its homes, printed architectural elements and training.[1][3]
In December 2023 it began a 2,168 square foot, four-bedroom printed house in Melbourne as a workforce housing model, projecting construction costs 38 percent below Brevard rates. WLRN reported in December 2024 that the house, after serving as a model home, was listed for sale.[1][2]
With Space Coast Habitat for Humanity and Macedonia Community Development Corporation it was printing Habitat homes in Melbourne in December 2024; WLRN reported that two homes, when finished, would be leased at costs set for households earning at or below 30 to 50 percent of area median income. Its director of construction said a print takes about 32 hours with two operators.[2]
How the company organizes production, and the production technology a source documents.
Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
No figure on print waste, material sourcing or reuse was found in the sources read.
The Habitat director expects lower utility bills from concrete walls; no measured energy or carbon figure was found.
Public radio reported in December 2024 two Habitat homes under way in Melbourne, to be leased at costs set for households at or below 30 to 50 percent of area median income, with keys due to a family at completion. Its cost claim of 38 percent below local rates is unverified.
Its director of construction cites a labor shortage of over 40,000 open positions and says two operators run a print. No headcount or training figure was found.
Public radio documents a finished model home listed for sale in December 2024, and the Florida Chamber reported in June 2026 the dedication of a Habitat home built with its technology in Melbourne. No total of homes or robots delivered was found.
4 sources, checked November 20, 2026.
Apis Cor
Active · Independent