China Construction Science and Industry, which calls itself CSCEC Science and Industry, is headquartered in Shenzhen and is part of China State Construction Engineering Corp. It works in steel structure contracting, general contracting, green building and new energy products. Its site lists plants in Huizhou, Tianjin, Wuhan, Meishan and Jiangyin in China and in Dubai, Algeria and Egypt, with combined capacity of over 1.2 million metric tons of steel a year.[3]
Xinhua reported in August 2026 that the Huizhou plant runs a fully automated steel module line over 400 meters long, building each room as six faces on parallel sub-lines with welding, assembly and grinding robots. A chief engineer of the green technology subsidiary put output at about 50 modules a day. Modules ship through Dongguan port to projects including an apartment building in New South Wales, and the company installed 101 ward modules and 168 equipment modules for a Shenzhen hospital in 12 days.[4]
In Hong Kong, the government says the company was commissioned to make about 9,300 MiC modules for Light Public Housing at Yau Pok Road, Tuen Mun Area 3A and Choi Hing Road. The company reports the Yau Pok Road estate, 1,767 homes of 14 square meters and 389 of 26 square meters, was occupied on March 28, 2025.[5][6]