Where it standsAnnounced a 130,000 square foot factory in Carson, California in December 2024. Building Design+Construction reported in July 2025 that it is the module maker for Cal Poly's 4,200-bed student housing project.[3][4]
FullStack Modular makes all-steel volumetric modules for mid- and high-rise apartments, hotels and student housing. It announced a 130,000 square foot factory in Carson, California in December 2024 and is the module maker for Cal Poly's 4,200-bed housing program. Its predecessor built the 363-unit 461 Dean Street tower in Brooklyn. Not public: production capacity, prices, modules delivered since 2016 and the current state of its Connecticut plant.
Verify first. Verify delivery of the first Cal Poly phase, expected by fall 2026, and whether the Connecticut plant still produces.
What it is
FullStack Modular designs, engineers and fabricates steel-framed modules that stack into mid- and high-rise buildings. It targets apartments, hotels and student housing.[1][3]
The business came out of Forest City Ratner's modular unit, which built the 32-story, 363-unit tower at 461 Dean Street in Brooklyn from a factory in the Brooklyn Navy Yard. Roger Krulak acquired the company from Forest City in September 2016 and is its founder and president.[2][3][5]
The company announced a move from Brooklyn to Hamden, Connecticut in 2023 and added the Carson factory in 2024. Its site lists only the Carson address. Its largest current job is Cal Poly San Luis Obispo's nine-building student housing program.[5][3][1][4]
At a glance
Status
Active
Role
Volumetric manufacturer
Method
Volumetric modules
Product
Room modules
Builds
Multifamily, Hospitality, Student housing
Headquarters
Carson, California, United States
Factory
Carson, CA
Serves
CA
Founded
2016
Production and technology
How the company organizes production, and the production technology a source documents.
Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
Materials and Circularity
Where do the offcuts go, and can this building be taken apart and used again?
Claims only
The company site states 67 percent less waste than conventional construction. It does not say how the figure was measured or where offcuts go, and publishes nothing on recycled steel content or disassembly.
No measured waste data, recycled steel content or disassembly information.
Energy and Carbon
What is the measured energy use or embodied carbon, and who checked it?
Specifics published
Building Design+Construction reported in July 2025 that the Cal Poly housing project is designed to achieve LEED Gold. That is a design target on a client project. No certified results, energy use or embodied carbon figures for its modules are public.
Evidence
Building Design+Construction reported that the Cal Poly housing project is designed to achieve LEED Gold certification.[4]
Gap
No certified results, energy use data or embodied carbon figures for its modules.
Cost and Access
What does a finished home cost, and who has moved in?
Specifics published
Project sizes are public: 4,200 student beds in nine buildings at Cal Poly and 363 apartments at 461 Dean Street in Brooklyn. The company states up to 25 percent lower building cost and publishes no prices, cost per unit or count of affordable homes.
Evidence
The Cal Poly project will provide 4,200 beds in nine buildings.[4]
The company claims up to 25 percent lower building cost.[1]
Gap
No cost per unit, rents or count of affordable homes delivered.
Workforce
How many people work there, and what happened to them when plans changed?
Specifics published
Company announcements give about 140 jobs for the Carson factory in December 2024 and 100 for the 2023 move to Hamden, Connecticut. Atlantic Yards Report wrote that production left Brooklyn in 2023. No current headcount by site or safety record is public.
Evidence
The company said the Carson factory would create about 140 jobs.[3]
Atlantic Yards Report wrote that the 2023 move to Connecticut involved 100 jobs and that the company said it had employed more than 250 New York workers over time.[5]
Gap
No current headcount by site, safety record or account of what happened to the Brooklyn workers.
Delivery Record
How many buildings exist today, and is the company still here?
Third-party evidence
Press confirms the 32-story, 363-unit tower at 461 Dean Street, built under the predecessor business, and in July 2025 named FullStack as module maker on Cal Poly's project of more than $1 billion. No list of buildings completed since 2016 or financial figures is public.
Evidence
461 Dean Street has 32 floors and 363 units; Atlantic Yards Report notes the work was done under the predecessor company.[2][5]
Building Design+Construction named FullStack as modular manufacturer on Cal Poly's project, which costs more than $1 billion.[4]
Gap
No list of completed buildings since 2016 and no public funding or financial figures.
Timeline
September 2016.Founded Roger Krulak acquired the modular business from Forest City Ratner Companies.[2]
June 2017.Factory Announced a $6 million investment to scale production at its Brooklyn Navy Yard factory, according to Atlantic Yards Report.[5]
April 2023.Factory Announced a move from Brooklyn to Hamden, Connecticut, with 100 jobs and an investment of $8 million to $12 million.[5]
December 17, 2024.Factory Announced the opening of a 130,000 square foot factory in Carson, California, and said it would create about 140 new jobs.[3]
2025.Milestone Building Design+Construction reported that prototype units went into production at the Los Angeles area factory in January and that manufacturing for Cal Poly's 4,200-bed, nine-building student housing project was scheduled to begin in late winter 2025, with a first phase expected by fall 2026.[4]