Legal & General Modular Homes

Volumetric manufacturer and developer · London, England, United Kingdom · checked November 25, 2026

Made cross-laminated timber modular houses at Sherburn-in-Elmet for its parent, Legal & General; production ended in 2023.

Legal & General Modular Homes logo
No site of its own when checkedClosed in 2023

Where it standsLegal & General stopped new production in May 2023; the Sherburn-in-Elmet factory closed that summer and the business moved to a phased wind down.[1][6][7]

Lead Analyst summary

Compiled from the five specialist findings. Read the findings.

The modular housing arm of the insurer Legal & General, which built cross-laminated timber houses in a 550,000 sq ft plant near Selby rated for 3,500 homes a year. By late 2022 its pipeline was about 2,200 homes in total. Production stopped in May 2023 with 475 staff at risk, and cumulative pre-tax losses reached 359 million pounds by 2023. Schemes were completed in Broadstairs and Selby, while homes in Bristol had to be dismantled over foundation faults.

Verify first. Whether aftercare and warranties for its homes are still being honored by Legal & General now the unit is wound down.

What it is

Legal & General opened its modular homes factory at Sherburn-in-Elmet in 2016. The 550,000 sq ft plant was designed to build 3,500 homes a year. Its two and three bedroom houses used cross-laminated timber, while a planned apartment product moved to a concrete and steel hybrid.[1][5]

Its schemes included 154 homes at Portholme Road in Selby, up to 30 percent of them affordable and designed for an EPC A rating, plus sites in Broadstairs and Bristol.[4][6]

In May 2023 it stopped new production and consulted on making most of its 475 staff redundant. Later accounts describe a phased wind down to finish existing developments; the company, Legal & General Homes Modular Limited, was still listed as active on Companies House in November 2026.[1][6][9]

What public reporting says happened

Causes as a cited source states them.

  • Legal & General said it could not secure the scale of pipeline needed to cover the factory's fixed costs.[1][2]
  • The company cited long planning delays and the Covid pandemic as reasons its site pipeline fell short.[1][3]
  • Construction Enquirer reports planning hold ups, mould in units stored outside the factory and foundation faults in Bristol as problems that came to a head.[7]

At a glance

Status
Closed in 2023
Role
Volumetric manufacturer and developer
Method
Volumetric modules
Material
Mass timber
Product
Whole homes
Builds
Single-family, Multifamily, Affordable housing
Headquarters
London, England, United Kingdom
Factory
Sherburn-in-Elmet, United Kingdom
Serves
United Kingdom
Founded
2016
Capacity per year
3,500 homes/yr capacity, reported 2023[1]
Factory floor area
550,000 sq ft factory floor area[1]

Production and technology

How the company organizes production, and the production technology a source documents.

Production

Large central factory
One 550,000 sq ft plant near Selby[1][5]

Technology

On record
No data
Was this page useful?Send a correction

Legal & General Modular Homes

Closed in 2023 · Part of Legal & General

No site of its own when checked