Materials and Circularity
Where do the offcuts go, and can this building be taken apart and used again?No factory waste, recycled content or disassembly figure was found in the sources read.
Gap
- Plant waste and recycling rates and timber sourcing.
Field Guides / Industrialized Construction / Asia Pacific
Panelized manufacturer and builder · Tokyo, Japan · checked November 25, 2026
Tokyo maker of factory-built wood panel homes, made to order in Japanese plants; part of Prime Life Technologies.
Where it standsA July 2025 release from its parent describes shared trucking between Misawa plants in Gunma, Aichi, Okayama and Fukuoka and other group plants.[1]
Compiled from the five specialist findings. Read the findings.
A Tokyo builder of factory-made wood panel homes, now a wholly owned company of Prime Life Technologies, the 2020 housing venture of Toyota and Panasonic. Its parent names four Misawa plants, in Gunma, Aichi, Okayama and Fukuoka. The Gunma plant makes components one order at a time. In 2013 the land ministry reported 1,619 Misawa prefab homes suspected of missing wall bracing. Output, prices and current plant capacity are not published in the sources read.
Verify first. Whether the 2013 bracing remediation was completed, and current output of the four plants.
Misawa Homes was first incorporated in 1967; the present company dates from 2003. Its group lists 7,894 consolidated employees and a head office in the Shinjuku NS Building, Tokyo. Its history notes a capital tie-up with Toyota Home and its later conversion into a wholly owned subsidiary of Prime Life Technologies.[2]
Prime Life Technologies was set up by Panasonic and Toyota in equal shares and was scheduled to start on January 7, 2020. Its housing companies Panasonic Homes, Toyota Homes and Misawa Homes have 14 production sites and 85 logistics sites between them.[3][1]
Techno F&C runs the Numata plant in Gunma, which it calls Misawa's main production plant. It makes wood housing components for Misawa to order, one house at a time, from about 150,000 structural part variations, and can ship in as little as three days. It is also moving into large panels for conventional post-and-beam construction.[4][5]
How the company organizes production, and the production technology a source documents.
4 factory locations in 1 other country, each confirmed by a source. Distance is measured to the nearest one.
Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
No factory waste, recycled content or disassembly figure was found in the sources read.
Its parent reports shared trucking among the three group house makers that cut transport emissions by 26 t CO2 a year by fiscal 2024. No home energy rating or embodied carbon figure was found.
No price per home and no affordable housing count was found in the sources read.
The Numata plant operator lists 433 employees, 387 men and 46 women, and holds ISO 9001 and ISO 14001. The group lists 7,894 consolidated employees. No safety data was found.
A 2013 land ministry notice records 1,619 Misawa prefab homes suspected of missing wall bracing, 1,063 of them in Okayama; five sampled homes were found structurally safe. Total homes built were not found in the sources read.
6 sources, checked November 25, 2026.
Misawa Homes
Active · Part of Prime Life Technologies
Quick scans, market reports and value chain maps for developers, manufacturers, funds and cities.
Now City Development ServicesApply the research in NowCity.ai