Skip to content

Field Guides / Industrialized Construction / Europe

Modulous

Software company and proptech · London, England, United Kingdom · checked November 27, 2026

Made TESSA housing design software and a kit of parts for modular apartments, built by partner suppliers, not its own plant.

Visit ModulousClosed in 2024

Where it standsModulous Limited entered creditors' voluntary liquidation in March 2024 and was dissolved in August 2025, per the UK register; its website was still online in November 2026.[1][3][4]

Lead Analyst summary

Compiled from the five specialist findings. Read the findings.

Modulous, a London company founded in 2018, paired TESSA design and cost software with a kit of parts that partner suppliers made into modules for apartments. It raised a 10 million pound Series A in 2022, made its staff redundant in November 2023 and entered liquidation in early 2024 owing about 6.2 million pounds. Press reported its only kit project, a 12-home Bristol pilot, half built at the collapse. The UK register shows the company dissolved in August 2025.

Verify first. The website is still online after the company was dissolved; anyone citing TESSA or the kit should confirm who, if anyone, now holds them.

What it is

Modulous Limited was incorporated in London in August 2018. Its chief executive was Chris Bone. It offered TESSA, software that generated multifamily housing schemes for a site with floor plans, area schedules, cost plans and embodied carbon figures, and a Kit of Parts, a standard set of assemblies made by supply chain partners so that no dedicated factory was needed. Modules were to be assembled near the site and set with a standard crane.[1][2][3]

It raised a 10 million pound Series A in September 2022 and listed a second office in Seattle. Its only kit client at the collapse was Bristol City Council, for a 12-home pilot on Romney Avenue that was half built in January 2024, with modules made and waiting.[1][2][5][7]

All staff were made redundant at the end of November 2023. A planned administration was not filed, a sale of TESSA fell through, and liquidators wrote to staff in late January 2024. The UK register records a creditors' voluntary liquidation from 21 March 2024 and dissolution in August 2025.[4][5][6]

What public reporting says happened

Causes as a cited source states them.

  • Former chief executive Chris Bone said the company had 30 million pounds pledged, but one funder pulled out and the rest was delayed, so it ran out of cash before the money arrived.[5][6]
  • Bone said venture funders expect fast growth while UK construction and planning move slowly, and that delays finding a site hurt the Bristol project.[5]
  • Building reported a 9.5 million pound loss on turnover of 91,000 pounds, with Bristol City Council its only client at the collapse.[7]

At a glance

Status
Closed in 2024
Role
Software company and proptech
Method
Volumetric modules, Kit of parts
Builds
Multifamily
Headquarters
London, England, United Kingdom
Serves
United Kingdom
Founded
2018

Production, technology and cost

How the company organizes production, the production technology a source documents, and where a source says it cuts construction cost.

Production

On record
No data

Technology

On record
No data

Cuts cost through

Schedule
Company claimed a 50 percent time saving on project delivery[2]
Waste
Company claimed a 70 percent cut in construction waste[2]
Was this page useful?Send a correction

Modulous

Closed in 2024 · Independent

Visit Modulous

Work with us.

Commission deeper research and reporting. Or get help building your industrialized construction value chain: partnerships, cost estimates and deal structures.