Prescient was founded in Broomfield, Colorado in 2012 and moved its headquarters to North Carolina in 2017, later to Charlotte. It described itself as a software and structural system maker: buildings were designed in its own patented software, and standardized light-gauge steel panels, trusses and columns were shipped as kits for assembly on site.[1][2][4][5][6]
Its first building, the five-story B Street LoHi apartments in Denver, was framed in six weeks in 2013. By May 2021 Construction Dive counted 57 completed projects, including hotels, student and senior housing, barracks and apartments up to 17 stories, such as West Village at UC Davis and Generation Atlanta. In 2020 it held ICC-ES certification for buildings up to 12 stories in seismic zones.[1][2][3]
Eldridge committed 90 million dollars in 2020, and JE Dunn and Eldridge led a 190 million dollar investment and bonding package in 2021 to grow its multifamily work. In 2022 it closed its 135,000 square foot Mebane plant, cutting 83 jobs. In 2023 it laid off 50 people in Arvada and then filed to close that plant, cutting 60 jobs.[2][3][4][5][6]