Materials and Circularity
Where do the offcuts go, and can this building be taken apart and used again?No factory waste, material reuse or disassembly evidence was found in the sources read.
Gap
- Factory waste figures and timber sourcing.
Field Guides / Industrialized Construction / Europe
Volumetric manufacturer · Foston, Derbyshire, United Kingdom · checked November 25, 2026
Made volumetric timber-framed houses in a Derbyshire factory; wound down in 2024 before a planned Corby plant opened.
Compiled from the five specialist findings. Read the findings.
A Goldman Sachs backed maker of volumetric homes with a 125,000 sq ft plant near Derby rated at up to 800 homes a year. It raised 70 million pounds in 2023 from investors including Persimmon and Aviva and took a 15 million pound Homes England loan, then paused a 650,000 sq ft Corby plant in March 2024, wound down the factory from October 2024 and stopped trading that November. No delivered home count was found.
Verify first. How many homes it actually delivered, and who now stands behind warranties on them.
TopHat built volumetric modular homes at a 125,000 sq ft factory near Derby with a stated capacity of up to 800 homes a year. In 2020 BoKlok UK appointed it to make timber framed two and three bedroom houses under a five year contract.[2][3][10]
In 2022 it announced a 650,000 sq ft factory at Magna Park, Corby, planned for up to 4,000 homes a year and 1,000 jobs. The plan was paused in March 2024.[1][2][3]
In October 2024 it began winding down its modular operations, completing existing orders and making most factory staff redundant. Inside Housing reported it stopped trading in November 2024, with losses of about 85 million pounds across five group companies in the year to October 2023.[1][2]
Causes as a cited source states them.
How the company organizes production, and the production technology a source documents.
Five AI specialists each read the sourced facts on this page for one question. A level measures the public evidence; the company itself is unrated. How the AI Research Team works.
No factory waste, material reuse or disassembly evidence was found in the sources read.
2023 press coverage of the Homes England loan said the planned Corby factory would make ultra low carbon homes. No energy rating, embodied carbon figure or verifier was found.
No price per home and no count of affordable homes delivered were found in the sources read.
Named press reports 212 people at the factory business in accounts to October 2022, and that most factory staff were made redundant from October 2024 during the wind down.
Raised at least 75 million pounds from Goldman Sachs in 2019 and 70 million pounds in 2023, plus a 15 million pound Homes England loan. It stopped trading in November 2024; group losses were about 85 million pounds in the year to October 2023. No delivered home count was found.
10 sources, checked November 25, 2026.
TopHat
Closed in 2024 · Independent
Quick scans, market reports and value chain maps for developers, manufacturers, funds and cities.
Now City Development ServicesApply the research in NowCity.ai