WinSun, reported as WinSun Decoration Design Engineering and based in Shanghai, prints concrete building sections horizontally on a large printer and lifts them into place. In 2014 its chief executive Ma Yihe said the printer was assembled from imported parts in a Suzhou factory, and the company claimed ten 200 square meter houses printed in under 24 hours at under $5,000 each.[3]
In January 2015 it showed a five-story apartment block and a 1,100 square meter villa at Suzhou Industrial Park, printed from a mix of glass fiber, steel, cement, hardening agents and recycled construction waste, with sections assembled like precast parts. ArchDaily reported orders from Tomson Group and the Egyptian government, as stated at the launch.[2]
Its components formed the Dubai Future Foundation's Office of the Future, opened in 2016, designed by Gensler with Thornton Tomasetti. ENR reported the parts were printed in 17 days at WinSun's facility near Shanghai and the office cost about $140,000. In 2019 COBOD wrote that the office was assembled from precast elements printed in Suzhou and finished by hand in Dubai.[4]