Ameresco

Developer and energy and water system operator · Framingham, Massachusetts, United States · checked November 23, 2026

Designs, builds, owns and runs efficiency, solar, battery, microgrid and renewable gas projects in North America and Europe.

Where it standsIts results for the quarter ended September 30, 2026 report 827 MWe of operating energy assets and a record $7.2 billion backlog; its 2025 10-K says shares held by founder George P. Sakellaris and certain family members carry about 74.5 percent of the combined voting power.[1][2]

Lead Analyst summary

Compiled from the five specialist findings. Read the findings.

Ameresco designs, builds and operates efficiency, solar, storage, microgrid and renewable gas projects, mostly for public bodies, and SEC filings report 827 MWe of operating assets at September 2026 and a $7.2 billion backlog. It reports 18 million metric tons of CO2e avoided in 2025, self-reported. Its 537.5 MW SCE battery contract ran past its 2022 target, with up to $89 million in damages at risk. The founder and family hold about 74.5 percent of votes.

Verify first. Ask how the SCE battery delays were resolved and whether its avoided emissions figures have third-party assurance.

What it is

Ameresco, based in Framingham, Massachusetts, was founded in 2000 and listed on the New York Stock Exchange in 2010. It designs, builds, finances and operates energy projects: efficiency and HVAC upgrades, solar, battery storage, microgrids, combined heat and power, and landfill gas and renewable natural gas plants. Its 10-K says about 61 percent of 2025 revenue came from federal, state, provincial or local governments.[2][3][4]

At the end of 2025 the 10-K reports 227 small-scale renewable plants it owns and operates, about 838 MWe, plus about 853 MWe in development or construction. Its results for the quarter ended September 30, 2026 report 827 MWe of operating energy assets on the release's own definition, 500 MWe in development and a total project backlog of $7.2 billion.[1][2]

Signature work includes a $91 million energy security project at Marine Corps Recruit Depot Parris Island, completed in 2019, and a 2021 contract to build 537.5 MW of battery storage for Southern California Edison. Those battery projects ran past their August 2022 target, and the 10-K reports up to $89 million in liquidated damages at risk.[2][5][6]

At a glance

Status
Active
Role
Developer and energy and water system operator
Headquarters
Framingham, Massachusetts, United States
Serves
United States, Canada, United Kingdom, Greece, +1
Founded
2000
Solution
Solar and storage[2][5][6], Microgrids[2][6], Building decarbonization[2], District energy[2][6], Resilience[5][6]
Installed capacity
827 MW installed, 2026[1]
Projects
227 projects, 2025[2]
CO2e avoided
18,000,000 t CO2e avoided a year, 2025[3]

Signature projects

  • Marine Corps Recruit Depot Parris Island energy security project, Parris Island, SC, 2019. Designed, built and operates under a 22-year ESPC A $91 million project with 5.5 MW of solar, a 4 MW, 8 MWh battery, a 3.5 MW combined heat and power plant and microgrid controls that can run the base in island mode.[6]
  • Southern California Edison distribution battery storage, Rancho Cucamonga, Long Beach and San Joaquin Valley sites, CA. Turnkey EPCM contractor for three battery systems Three four-hour battery systems totaling 537.5 MW and 2,150 MWh at SCE substation parcels, contracted in 2021 for August 2022; the 10-K reports two of three substantially complete.[2][5]
  • Savannah River Site cogeneration facility, Savannah River Site, SC. Subsidiary contracted to build and operate it A cogeneration facility at the U.S. Department of Energy Savannah River Site that a subsidiary is contracted to build and operate, per the 10-K; the filing gives no capacity or date here.[2]