Energy and water system operator and developer · Toronto, Ontario, Canada · checked November 23, 2026

Runs district heating and Deep Lake Water Cooling for about 200 downtown Toronto buildings, plus systems in Ontario and PEI.

Where it standsOwned by IFM Investors and Ontario Teachers' Pension Plan since 2021; it commissioned a Deep Lake Water Cooling expansion in 2024 and a heat pump plant in Toronto in September 2025.[2][5][7][8]

Lead Analyst summary

Compiled from the five specialist findings. Read the findings.

Enwave Energy, based in Toronto, runs about 200 downtown buildings' heating and cooling, including Deep Lake Water Cooling, and systems in London, Windsor, Markham and Charlottetown. Its US assets were sold to different buyers in 2021; this record covers the Canadian company owned by IFM Investors and Ontario Teachers'. It expanded lake cooling in 2024 and opened a heat pump plant in 2025, backed by a C$600 million federal loan. Carbon figures are projections.

Verify first. Measured emissions cuts against the 77,800 t CO2e per year the federal lender projects, and which network a given building would join.

What it is

Enwave Energy is a Toronto-based owner and operator of community district energy systems. Its Toronto network serves about 200 buildings and more than 40 million square feet downtown through four linked plants and 25 miles of pipe, and it also lists systems in London, Windsor, Markham and Charlottetown. Its Deep Lake Water Cooling system draws cold water from the bottom of Lake Ontario.[1][3][4]

It traces to the Toronto Hospitals Steam Corporation of 1970, became the nonprofit Toronto District Heating Corporation in 1980 and a for-profit company named Enwave in 1999. Brookfield Infrastructure bought it from the City of Toronto and Borealis in 2012. In 2021 Brookfield sold the business in two deals: IFM Investors and OTPP bought the Canadian portion and QIC and Ullico bought the US assets.[5][6]

The Canada Infrastructure Bank committed a $600 million loan to its expansion in Toronto and Mississauga in 2021. In 2024 it commissioned a fourth lake intake, run with Toronto Water, that raised cooling capacity by 60 percent, and in September 2025 it commissioned a heat pump plant that turns waste heat from cooling customers into hot water.[7][8][9]

At a glance

Status
Active
Role
Energy and water system operator and developer
Headquarters
Toronto, Ontario, Canada
Serves
ON, PE
Founded
1970
Solution
District energy[1][4], Heat pumps[8]
Buildings served
200 buildings served, 2026[4]

Signature projects

  • Deep Lake Water Cooling fourth intake expansion, Toronto, ON, 2024. Owner, developer and operator John Street expansion of the system that draws cold water from Lake Ontario, run with Toronto Water; begun in 2021, it raised cooling capacity by 60 percent, room for 40 more buildings.[7]
  • Pearl Street Green Heat plant, Toronto, ON, 2025. Owner, developer and operator Heat pump plant that upgrades waste heat from cooling customers into hot water, rated at 62,000 MBH of heating and 3,600 tons of cooling, with up to 11,600 tCO2e displaced.[8]
  • The Well thermal storage, Toronto, ON. District energy provider Enwave serves this development of more than 3 million square feet of office and homes and added a thermal battery that makes and stores energy at night at off-peak cost.[4]